Re-approval
Re-approval is a process that a property undergoes if a significant change in its construction, use, or equipment has been made after the in...
Re-approval is a process that a property undergoes if a significant change in its construction, use, or equipment has been made after the in...
A building permit is an official document issued by the local building authority or another relevant state institution that gives permission...
A zoning permit is a legal act issued by the local building authority based on the zoning procedure within the framework of the building law...
Final inspection or "kolaudace" in Czech is a process where the building authority or another authorized organization checks a completed con...
'Soil quality' often refers to the quality or fertility of the soil within a particular land pool or area. The term 'suitability' in relatio...
SEA stands for "Strategic Environmental Assessment" or Strategic Environmental Assessment. It is a similar concept to EIA (Environmental Imp...
A zoning plan, known as "Územní plán" (ÚP) in Czech, is a strategic planning document that outlines how a particular area or territory can b...
EIA (Environmental Impact Assessment) is a process for evaluating the impacts of proposed projects or activities on the environment. In the ...